Cutting fleet stoppages and delays at an open-pit mine
An open-pit mine with trucks, excavators and a crusher, where unreported stoppages cost whole shifts of production.
See the case study Industry
Cutting unplanned stops on a bottling line
A beverage bottling line, from fermentation to palletising, where a stopped machine only showed once product was already piling up behind it.
See the case study Energy
Cutting the demand peak at an industrial site
An industrial site fed by the public grid and a backup generator, where the energy bill arrived with no explanation of what drove it up.
See the case study Water and environment
Early leak detection on a water distribution network
A treatment plant and the network it supplies, where a burst pipe was only discovered when someone complained about having no water.
See the case study Agriculture
Cutting irrigation water use on a farm
A farm with drip irrigation and pivots, where the decision to irrigate followed the calendar rather than what the soil actually held.
See the case study Logistics
Ending cold-chain breaks in food transport
A cold store and the fleet delivering to customers, where a cold-chain break only showed up on delivery, the product already compromised.
See the case study Buildings
Cutting after-hours energy use in an office building
An office floor where the electricity bill did not distinguish normal working-hours consumption from whatever stayed on overnight.
See the case study Oil and gas
Early detection of blockages and leaks at an oil production unit
A production unit with wells, a separator and tanks, where the reading round was the only way to know what was happening on the ground.
See the case study Healthcare
Safeguarding the vaccine cold chain at a health centre
A health centre where the cold chain relied on a sheet filled in morning and afternoon, with all the risk concentrated in the hours no one was looking.
See the case study Street lighting
Automatic fault detection for street lighting
An avenue of ten lamps, where a fault was only known through a resident's complaint or a costly, slow night round.
See the case studyNo case study matches these filters. Try another word or category.
Cannot find your case?
Describe your installation and your monitoring goals. If it is a physical quantity, there is almost always a way to measure it; what varies is the investment and the complexity of implementation.